Preparation of a topographic drawing at a scale of 1:500 based on lidar data and orthophotos. 55 hectares. The vectorisation included the creation of horizontal and elevation marks, as well as a detailed display of the terrain, including roads, ditches, rivers and other elements.

The market leader in Latvia in providing geodetic and cartographic services.
Data volume: large amounts of LiDAR data, needing hardware to match and efficient processing algorithms. Detail: the topographic map detail requirement was high, and meeting it took close data analysis and manual revision. Regulatory framework: the maps had to comply with Latvian legislation on topographic map creation.
Strict compliance with the terms of reference. Clear work schedule. Regular reporting.
Data analysis: Detailed analysis of lidar data and orthophotos to identify terrain features, infrastructure and other elements to be vectorised. Terrain vectorisation: Horizontals: Create horizontals in 0.5 m increments for detailed mapping of landforms. Elevations: Placement of elevation marks in 20 m increments on roads and at characteristic terrain points (highest and lowest points). In other areas (forest, meadow, etc.), elevations were placed in 15 m increments. Linear objects: Vectorisation of ditches, rivers, ravines and other linear terrain features. Vectorisation of infrastructure objects: Vectorisation of roads, buildings, green spaces and other infrastructure objects based on orthophoto and lidar data. Quality control: Perform detailed visual and attribute quality control of vectorisation to identify and correct errors.
GisPoint produced topographic maps at 1:500 scale across 185.55 hectares. The maps comply with Latvian legislation and are used for: Territory Planning: urban planning documentation, infrastructure design. Engineering Calculations: design of roads, bridges, engineering networks. Cadastre: registration of land plots, determination of property boundaries. Other Purposes: scientific research, monitoring changes in the terrain.
Strict compliance with the terms of reference
Clear work schedule
Regular reporting



