True-cost calculator
The expensive part isn't the rate. It's the ramp. Every month a generic vendor spends learning GIS is spend burned before a line of value ships. Our engineers start on day one.
Our engineers already know PostGIS, GeoServer, OGC and LiDAR pipelines: no discovery tax, no lock-in, the code is yours.
A generic vendor burns $42,000 ramping and redoes $6,300 before real value ships. Geo-native starts ~3 mo earlier.
| Time to value | Generic dev vendor | GIS-Point |
|---|---|---|
| Learning the geo domain | ~3 mo | 0already know it |
| Discovery before start | long | short |
| Risk of building wrong | high | low |
| Code & IP | possible lock-in | yours · open-sourceno Esri lock-in |