Job description
After data preprocessing and automatic classification, which divided the point cloud into different classes (such as land and vegetation), the remaining points were classified manually.
Mobile Lidar scanning with an accuracy of 3 cm and a scale of 1:500 was used to vectorize the available data. The peculiarity of this approach is that the vectorization was carried out in three coordinates X, Y, Z using Lidar scanning. This approach allows us to create a detailed and accurate mapping database, which is a prerequisite for providing quality information about infrastructure facilities.
- Spent time: 28 hours
- Processing volume: 4.2 hectares
- Software: AutoCAD Civil 3D
- Price per 1 km: Urban area – $78 / Countryside – $36
- Output File: 3D.DWG
Have a similar project?
Contact us, we’ll help with its implementation.
United Kingdom
Devonshire str., 41, Ground Floor, London W1G 7AJ, UK
Estonia
Harju maakond, Tallinn, Kesklinna linnaosa, Kaupmehe tn 7-120, 10114, Estonia
Ukraine
Ukraine, Lviv, Sadova street, 2a/1
+380672088520 Ievgen Lavrishko
info@gis-point.com